How to use this checklist
This is a tradition-aware 12-month framework for Sri Lankan weddings. Sinhala Buddhist, Tamil Hindu, Muslim, Christian and fusion weddings share the same skeleton, but each has tradition-specific tasks marked inline. The full interactive version of this checklist, tradition-aware, with reminder dates and task assignment to your partner / family, lives inside the MarriFlow planning app.
Month 12, Foundations (the boring but critical month)
- Decide your tradition: Sinhala Buddhist, Tamil Hindu, Muslim, Christian, modern fusion (or multi-tradition).
- Set the top-line budget. Use the MarriFlow Budget Calculator for tradition-specific allocation.
- Decide guest count range (often the biggest budget lever).
- Sinhala Buddhist + Tamil Hindu: consult family astrologer for Nakath / Muhurtham.
- Open a dedicated joint wedding bank account.
- Draft your initial guest list (don't finalise, leave 20% slack).
- Start a shared Pinterest / vision board with your partner.
Months 11–10, Lock the venue and the date
- Shortlist 5 venues that fit guest count and tradition.
- Visit all 5; ask for written quotes including plate cost, service charges, bar minimums, hall rental, parking.
- Confirm tradition fit: Poruwa space, Homa fire-altar permission for Tamil Hindu, halal catering or kitchen for Muslim weddings.
- Book the venue. Pay deposit (typically 20–30%).
- Confirm Nakath / Muhurtham with the venue.
- Send save-the-date messages to diaspora guests (so they can plan flights).
Months 9–8, Photographer, videographer, planner
- Shortlist 5 photographers, video-call all 5, view full wedding galleries from each.
- Book photographer + videographer (often bundled at 15–25% discount).
- Decide on full-service planner or day-of coordinator. Book.
- Book pre-wedding photo session date.
- Tamil Hindu: contact priest (Vadhyar / Iyer); confirm Manavarai builder.
- Sinhala Buddhist: confirm Magul Beraya ensemble, Jayamangala Gatha singer.
- Muslim: confirm Quazi, Mehndi night plans.
- Catholic: schedule pre-Cana counselling, banns reading at parish.
Months 7–6, Catering, florist, decorator, attire
- Lock catering (or confirm in-house menu with venue).
- Book florist; brief on tradition (Poruwa / Manavarai requirements).
- Book decorator; confirm setup timing.
- Bride: order Osariya (Sinhala) / wedding saree (Tamil Hindu / Muslim) / wedding gown (Christian / fusion).
- Groom: order suit / Veshti / Sherwani.
- Book hair and makeup artist; schedule trial 2–3 months before wedding.
- Book wedding cake maker.
Months 5–4, Stationery and supporting vendors
- Design and order wedding invitations (trilingual: Sinhala / Tamil / English as relevant).
- Book DJ, lighting, AV, transport (bridal car + guest coaches if needed).
- Book honeymoon (often Bentota, Kandy, Galle for domestic; Maldives / Bali for international).
- Confirm reception entertainment plans (live band? dance segment?).
- Set up wedding website (MarriFlow Wedding Website builder).
- Order favours / return gifts.
Months 3–2, Finalising
- Send formal wedding invitations 8–10 weeks before the date.
- Final menu tasting with caterer.
- Pre-wedding photo session.
- Hair and makeup trial.
- Confirm transport for parents and grandparents.
- Confirm marriage registrar (for Buddhist / civil weddings).
- Diaspora couples: arrive in Sri Lanka 2–3 weeks before for final coordination.
Month 1, Last details
- Final RSVP deadline (3 weeks out).
- Provide final guest count to caterer (14 days out).
- Pre-wedding rituals begin: Mehndi night, Pallikai Thelippu (Tamil Hindu), Mangsam / Nikah night (Muslim), Pirith chanting (Sinhala Buddhist).
- Final venue walkthrough with planner.
- Confirm vendor arrival times, Magul Beraya drummers especially.
- Pack honeymoon bags. Confirm honeymoon flights.
Wedding week
- Pick up bridal Osariya / saree / gown. Try on once more.
- Confirm vendor arrival times in writing.
- Eat well. Sleep well. Drink water.
- Pre-wedding Mehndi / Pirith / Henna night.
- Wedding day: trust your planner, breathe, enjoy.
Frequently asked questions
When should I start planning my Sri Lankan wedding?
12 months ahead is the practical minimum. 14–18 months is recommended for diaspora couples, multi-tradition weddings, or destination weddings in Galle / Kandy. Top venues and photographers for peak Nakath windows are booked 10–14 months out.
What are the most important wedding vendors to book first?
In order: venue, photographer, videographer, planner. These are the vendors that book up earliest and have the least flexibility. Lock these four in your first 4 months of planning. Catering, florist, decorator, attire, DJ can be booked in months 5–8.
How long before the wedding should I send invitations?
Save-the-date messages: 6–9 months out (especially for diaspora guests booking flights). Formal printed invitations: 8–10 weeks before the wedding. RSVP deadline: 3 weeks before the wedding so you can give the caterer final headcount 14 days out.
· Sources & references
- MarriFlow Planning Desk, checklist patterns across 1000+ Sri Lankan weddings
, MarriFlow Editorial
Planning Desk · MarriFlow